Large And Medium Repair Contract For Equipment

Party A: (short hair workshop)


Party B: (equipment department)


Enter into a contract for the repair of large and medium equipment, and reach the following terms by mutual agreement.


Requirements of Party A


1,

equipment

Large and medium repair

equipment

The Department shall be responsible for arranging the maintenance plan, and stipulate the handover date, fulfill the pfer procedures (follow the rules) and ensure the normal production.


2, the equipment department stipulates that during the commissioning period, the maintenance department will be responsible for the maintenance and recharge.


3, plan changes, workshop put forward maintenance plan, equipment department should cooperate.


4, the equipment department is overhauled, sorting out the waste parts, concentrating the designated locations and clearing the sanitation.


5, the maintenance plan of the equipment department has changed, and the workshop should be notified three days in advance, otherwise the economic responsibility should be borne.


6, in the production process, resulting in unplanned stop or less.

Overhaul

The equipment failure caused by the cycle (the responsibility of the analysis is determined by the equipment department) shall be directly responsible for the direct loss.


Party B's request


1, the maintenance and oil filling short hair workshop is responsible for defining the maintenance limits, making good cooperation and jointly serving the production.


2, if the equipment overhaul plan is changed, the equipment department should be notified three days in advance, otherwise the financial responsibility should be borne.


3, deliver the repair equipment according to the regulations. The workshop should explain the operation of the equipment and the defects, and keep the parts intact and hygienic (especially to remove the oil pollution).


4, any equipment failure due to improper operation of maintenance and oil injection (after analysis, the responsibility is the workshop) should bear financial responsibility. If the maintenance strength is insufficient, it is possible to propose maintenance cooperation and rush repair.

  • Related reading

中外来件装配合同

Contract template
|
2011/1/6 11:35:00
37

System Engineering Contract

Contract template
|
2011/1/6 11:33:00
44

Contract For Feasibility Study Of Construction Projects

Contract template
|
2011/1/6 11:31:00
43

Integrated Kitchen Production Contract

Contract template
|
2011/1/6 11:29:00
57

Repair And Repair Contract

Contract template
|
2011/1/6 11:26:00
35
Read the next article

Health Tips: Pay Attention To Scientific Wear And Good Health

01 - 06, high - heeled shoes are the temptation of a woman's life. Summer high-heeled shoes are more powerful - naked feet, red red cardamom, the elegance of high above.